The record so far
- October 2026 — Concept design completed, with the hydraulic, water and energy calculations behind every performance figure published here.
- November 2026 — Reference design and performance restated. The design settled on the configuration described on the Project page, and the water balance and the energy model were rebuilt over a 34-year rainfall and solar record. The design now delivers 98.7% of annual energy from on-site renewables, with gas firming on about 29.5 days a year.
- 2026 — Site assessment under way through the Crown land and Native Title processes, with the Northern Land Council.
How it would be delivered
The delivery model is shaped with partners rather than prescribed to them. Sunsurge is the originator and developer. We do not intend to construct or fund the project on our own; we intend to assemble the right parties around a design that is already documented well enough to be priced and built.
There is no single correct structure for a project of this kind, and we are open to all of the common ones — and to combinations of them:
- Tenant-led. An anchor tenant takes a long lease and, if it wishes, a position in the supply side of the campus. This is the structure that puts the largest single commitment closest to the design.
- Joint venture. Equity shared between Sunsurge and a capital or strategic partner, with governance matched to each party's contribution and appetite.
- Separated ownership. The generation and storage owned by an infrastructure investor, the campus by the operator or the tenant — for partners who want the energy asset and the digital asset on separate balance sheets.
- Build–own–operate and transfer, or a concession. A partner finances, builds and operates for a defined term, with the asset transferring at the end of it.
- Developer with an EPC contractor. Sunsurge develops and holds the asset, with construction carried by a contractor under a fixed-price, date-certain contract.
Other business format
Each format carries a different allocation of risk and return, a different tax and accounting outcome, and a different governance burden. The starting point is the requirements of the partner, not a prescribed template. If a structure not listed here suits the parties better, we are open to discussing it.
Partner with us sets out what we are looking for.
What has not happened
The following matters are recorded as they stand, so that the position is unambiguous:
- No land tenure is held.
- No approval has been granted, by the Territory or the Commonwealth.
- No offtake is contracted, and no tenant has signed.
- No financing is in place.
- No construction has begun.
The concept design is complete and documented well enough to be priced and built. Everything between that and a construction site is in the list above, and we will report each one as it changes.