Sunsurge Pty Ltd

Renewable energy and power infrastructure development

Sunsurge Pty Ltd is a Darwin-based development company. We originate and develop utility-scale renewable energy and power infrastructure — including the Enterprise Digital Centre in the Top End of the Northern Territory.

The Enterprise Digital Centre Contact us

At a glance

250 MW data centre campus, 200 MW of it IT load
9,194 MWh of pumped-hydro storage behind the campus
98.7% of annual energy generated on site from renewables
Islanded no grid connection, no import, no export

Who we are

Sunsurge Pty Ltd is a Darwin-based renewable energy and power infrastructure development company. It is chaired by a Northern Territory-based construction industry principal with more than three decades of delivery experience in remote Australia, and its leadership team combines major-project development, energy construction and commissioning, Indigenous affairs and finance.

Tom Hutcheson, our Chairman and Managing Director, is a Wakka Wakka and Kabbi Kabbi man, and Shaun Hill, our Executive Director, Indigenous Affairs, has spent his career in Indigenous participation and supplier diversity — including with the Northern Land Council. Engagement with traditional owners and native title parties is their direct responsibility.

What we do

Renewable energy development

Utility-scale solar, wind and pumped-hydro energy storage — from site identification and feasibility through environmental approvals, grid and offtake strategy, to construction readiness.

Power infrastructure delivery

Precinct-scale industrial power infrastructure, transmission corridors, substations and utility connections, headworks and subdivision design, and power flow modelling.

Strategic advisory

Energy strategy, land access, environmental compliance across NT EPA, EPBC, AAPA and ILUA processes, and the commercial disciplines needed to reach an investment decision.

Our current development

Enterprise Digital Centre

The Enterprise Digital Centre: a reference design for a 250 MW hyperscale data centre campus, powered entirely from on-site generation on an islanded basis — no grid connection, no import, no export. Concept stage; no land tenure is held yet. Read the reference design and its status.